Deliverable nameDel. no.Due DateNatureDiss. levelStatus
System requirements reportD1.13/31/2012RCOAccepted
CP process handbookD6.14/30/2012RREAccepted
Delivery of modified APU stacksD3.16/30/2012PREAccepted
Project website (with continuous updates) and materialsD6.26/30/2012RREAccepted
Test planD1.26/30/2013RREAccepted
APU Stack test standardsD1.36/30/2013RPUAccepted
Proof of industrialization / packaging study regarding truck integration for JE and AVL systemD2.46/30/2013RCOAccepted
Pre-tests of modified JE-components and subsystemsD2.56/30/2013RCOAccepted
Project website (with continuous updates) and materialsD6.26/30/2013RREAccepted
Periodical ReportD6.36/30/2013RCOAccepted
APU stacks, fuel tolerance test reportD3.38/30/2013PCOto JU
Benchmark of 2 different APU systemsD2.310/31/2013RCOto JU
Test results of JE APU system testsD2.13/31/2014RREto JU
Delivery of optimized APU stacksD3.26/30/2014PREto JU
Truck-APU for vehicle demonstration delivered to VolvoD4.26/30/2014PREto JU
Project website (with continuous updates) and materialsD6.26/30/2014RREto JU
APU stacks, lifetime test reportD3.48/31/2014PREto JU
System Approach for the optimized DESTA SOFC APU and production cost estimateD4.412/31/2014RREto JU
Project website (with continuous updates) and materialsD6.212/31/2014RREto JU
Acceptance test of optimized SOFC-APUD4.12/28/2015RCOOpen
APU system installed on vehicleD5.12/28/2015DREto JU
Test results of AVL APU system testsD2.25/31/2015RREOpen
Durability and Reliability assessment of DESTA SOFC APU systemsD4.36/30/2015RREOpen
APU system tested on vehicleD5.26/30/2015RREOpen
Final ReportD6.36/30/2015RCOOpen

 

 

Nature of DeliverableDissemination Level

R: Report

P: Prototype

D: Demonstrator

PU: Public

RE: Restricted to a group specified by the consortium

CO: Confidential